From this summer, a 1-day Ha Long tour from Hanoi will be more comfortable, save time and fully experience for tourists. Will be considered a good option in parallel with the overnight cruise tour has been very developed for many years. After more than 3 years of construction, Ha Long - Hai Phong expressway project about 25 km long connecting Ha Long city (Quang Ninh) with Hai Phong city has basically completed. The project will be open in the second quarter of 2018. This project has a starting point on Highway 18, in Dai Yen Ward, Ha Long City, at the end of the intersection with Ha Noi - Hai Phong Expressway, Dong Hai 2 Ward, Hai An District, Hai Phong. According to the design, this highway has a total length of about 25 km, including 4 lanes, design speed is 100km / h; total investment of more than 13,000 billion. Ha Long - Hai Phong Expressway consists of 2 component projects. Firstly, the road linking Ha Long City with Bach Dang Bridge was invested by the Quang Ninh Department of Transport (total investment of over VND6,400 billion from the provincial budget and other mobilized funds). Total length of this route is 19.8 km, 4 lanes highway. Secondly, Bach Dang Bridge, BOT route and intersection with the total capital of more than 7.277 billion, started construction in January 2015, is expected to be put into use before 30/6 . When the Ha long - Hai phong expressway goes into use, the distance from Ha Long to Hanoi is reduced to 50 km, to 130 km; From Ha Long to Hai Phong only 25 km instead of 75 km as today. Mr. Nguyen Duc Long, Chairman of Quang Ninh People's Committee, said that this is an important project for the development
From this summer, a 1-day Ha Long tour from Hanoi will be more comfortable, save time and fully experience for tourists. Will be considered a good option in parallel with the overnight cruise tour has been very developed for many years. After more than 3 years of construction, Ha Long – Hai Phong expressway project